Installation Process(installation of silo)

installation of silo

installation of silo

1.Install the deformation port and hopper(installation of silo)

When installing the deformation port, pay attention to the feeding direction.

When installing the hopper, put three holes and one hole rubber pad first, then insert the plate, and finally install the rain shield. The deformation port, the lower cone discharge port and the connection of the hopper are sealed with glass glue.2.Connect the PVC pipe(installation of silo)

When installing the three-way gate, first make a hole on the PVC pipe, and the hole size can be selected from the following schemes. When installing, the center line of the material pipe should be 20 cm away from the material box, so as to facilitate the removal of the lower material pipe from the material box.

 

Option 1: Round hole                  Scheme 2: Square hole

φD L*M
75 Pipe 60mm 60mm*60mm
90 Pipe 75mm 75mm*75mm

Assembly of the three-way gate:

Hanging fixed feed tube(installation of silo):

According to the width of the standard chicken house about 12 meters, the spacing between the feeding openings is greater than 2 meters and less than 4 meters, and the spacing is evenly arranged.

Reinforce main feed tube with round steel or iron chain:

The material pipe is connected to the main connection box, and the motor is suspended

The suspension motor is reliable, and the reaming hole at the end of the material pipe is fastened with the material pipe of the motor connection box:

Assemble auger and shaft components, main card, etc.

The auger should be in a relaxed state as much as possible, neither too loose nor too tight, so as to avoid excessive wear on the material tube.

When intercepting the auger, you must first pull the auger a few times to make it stretch naturally.

Then mark the bottom part of the hopper. Generally, 0.7%-1% of the degree of pre-tightening of the auger from the mark:

Install rubber transparent hose, hose clamp, feeding pipe and material level sensor, etc.

It is required that the throat hoop is tightened, the length of the feeding pipe is suitable, and the length of the nylon rope is suitable.

Outdoor feed line support foundation and embedded parts(installation of silo)

Require:

  1. The concrete foundation of the embedded parts is: 1000*1000*1000 (mm)
  2. The concrete foundation is 8~10mm higher than the ground
  3. The screw rod is 40~50mm higher than the concrete foundation ground
  4. Ensure that the lead screw higher than the concrete base surface is effective (M20 nut is screwed in smoothly)

Require:

  1. The concrete foundation of the embedded parts is: 1000*1000*1000 (mm)
  2. The concrete foundation is 8~10mm higher than the ground
  3. The screw rod is 40~50mm higher than the concrete foundation ground
  4. Ensure that the lead screw higher than the concrete base surface is effective (M20 nut is screwed in smoothly)
  5. Strictly ensure that the size of the embedded parts is 240*240

As shown in the figure, the suspension point of the horizontal main material line is approximately 1.5 meters, and each suspension point is equipped with a circular chain of 1 meter; It can be lengthened appropriately, and the ring chain intercepted on site is also lengthened appropriately to ensure a smooth transition of the material tube

In a pig farm equipped with a weighing room or a feeding room, the distance between the motor connection box of the outdoor feeding line and the relay hopper is about 0.5-1.5 meters, which makes future maintenance and cleaning more convenient. If there is no weighing room or feeding room, the relay hopper can be placed in a uniform position above the chicken house according to the principle of easy installation.

Pay attention to the installation position and spacing of the relay hopper and the motor connection(installation of silo)

The two ends of the relay hopper are respectively connected with the suspension 2 and the main pipe card, and then the relay hopper is covered by the flat plate 4 and the flat plate 5.Note that the contact of the galvanized sheet of the bolt connection should be sealed with a glue strip(installation of silo).

Mus Agro an excellent Pig farm feeding equipment manufacturer.

If you plan to build a new piggery farm, you can contact Mus Agro by [email protected], we can offer a free designing for your piggery farming project!

Never let client down Value creating:Benefit client first,then benefit yourself Fast moving: Be efficient every specific work and obligation

Get in Touch





    [_url]

    Whatsapp
    008618503860553
    Email
    [email protected]
    Inquiry
    Top